Flagship deliverable · shown in full
Continuity Report
Knowledge transfer - Dispatch Lead
Executive summary
Mari Vega is the single point of failure on the dispatch board, and has not taken a real vacation in four years. This proactive capture built a backup so she can take two weeks off without service degradation. Three sessions raised coverage from 0 to 81/100 and cut single points of failure from 5 to 1. The judgment that ran the board on a bad day - tight-lane buffers, backup carriers, and real customer slack - is now a reference Theo can hold. With one supervised week, he can run a normal fortnight; only the Q4 peak surge remains for a follow-up.
01 · Critical capabilities & current coverage
- Hot-load / exception triage - was Mari only; now a documented decision guide with Theo shadowing.
- Backup-carrier network - captured as a per-lane cheat sheet with after-hours contacts.
- Tight-lane buffers - documented; flagged to encode in the TMS.
- Daily board operation - transferable; Theo runs it with the cheat sheets.
02 · Tacit knowledge captured
- Which green is really amber: the tight lanes that need a buffer the TMS doesn’t show.
- Reroutes: the choke points to route around before the system flags a delay.
- Real slack: ranking customers by actual flexibility, not SLA tier, to triage a crunch.
- After-hours carriers: who runs chains and who answers their cell when a pass closes.
03 · Risks & mitigations
- High - tight-lane buffers were undocumented. Cheat sheet now; TMS encoding proposed. Owner: Ops, wk 1.
- High - backup carriers lived only with Mari. Per-lane card built. Owner: Mari, wk 1.
- Med - Theo has not run the board solo. One supervised week before the vacation. Owner: Theo, wk 2.
- Med - Q4 peak surge is deeper than this window. Follow-up capture scheduled. Owner: Ops, post-vacation.
04 · Backup readiness - Theo Ramirez
Theo already operates the TMS and the routine board. With the tight-lane cheat sheet, the backup-carrier cards, and one supervised week, he can run a normal fortnight - which is exactly the goal. A severe-weather day alone is close but not certified; the supervised trial run is designed to close it. Peak-season (Q4) is intentionally out of scope for this window and scheduled as a follow-up.